# A travelling bard — review proposal

Status: independent concept for possible 2027–28 work; not an artist-approved project.
Publisher: Dominique / Loptr Lab. Prepared 2026-10-07 with AI-assisted research and drafting.
Page: [bard-tour.html](../bard-tour.html).

## Authority and execution

Ren has no obligation to read, respond, participate or provide personal information. No contact, consent, booking, sponsorship or rights clearance is established by this page. No execution as a Ren project without his affirmative agreement and complete control, subject to professional clinical judgment and legal duties. Silence is not agreement. Publication of a pitch is not permission to use his work or enroll him.

Review and production are separate. Agree scope, compensation, ownership, privacy, creative approvals, cancellation and exit before work. Announcements, guest credits, broadcasts and commercial activity each need separate approvals. Funding buys no artist access or clinical data.

## Reused resources

The page extends styles.css, navigation.css, navigation.js and the shared lazy PIXIE launcher and links existing Sessions, Streamplace planning, Story Finder and story-permission resources. No production broadcast, payment, invitation, directory record, tracker or clinical workflow was added. No artist images or recordings were copied. The page is marked noindex,follow as a review pitch; this is not access control and the public repository remains public.

## Evidence and corrections

The page contains a dated source ledger separating historical event records, official releases, manufacturer facts and protocol documentation from proposed routes, energy estimates and economics. Existing SOURCE_REGISTER.md remains authoritative for other artist editorial references. This pitch adds no claims about current clinical needs, residence, preferred base, immigration status or environmental beliefs.

The initial discussion's ten-day Sussex loop was superseded by an optional four-week, single-base calendar. Ten-day operating allowances do not finance that calendar. There is no four-chapter output commitment. No statistical probability of execution is supportable.

## Release review

- Verify local links, unique IDs and the existing test suite.
- Inspect portrait and landscape tablet/mobile layout, text enlargement, keyboard focus and print output before public release. Automated responsive checks do not replace an actual iPad Safari check.
- Confirm that proposal status and no-obligation wording remain visible in the opening section and social description.
- Recheck manufacturer quotations, converted payload and HVAC, staffing/care costs, rights, insurance and jurisdiction-specific work authorization for 2027–28.
- Owner review precedes merging. Ren's agreement precedes execution; a repository merge cannot supply it.

Corrections/removal use the repository issue tracker for non-sensitive requests. Do not publish health data there.
